Skip to content

feat: upgrade to go 1.23 #123

feat: upgrade to go 1.23

feat: upgrade to go 1.23 #123

Triggered via push August 29, 2024 20:50
Status Failure
Total duration 1m 0s
Artifacts

docker.yml

on: push
Matrix: docker
Fit to window
Zoom out
Zoom in

Annotations

7 errors
docker (linux/386, linux, 386)
Process completed with exit code 2.
docker (linux/arm/6, linux, arm, 6)
The job was canceled because "linux_386_linux_386" failed.
docker (linux/arm/6, linux, arm, 6)
The operation was canceled.
docker (linux/arm64, linux, arm64)
The job was canceled because "linux_386_linux_386" failed.
docker (linux/arm64, linux, arm64)
A task was canceled.
docker (linux/amd64, linux, amd64)
The job was canceled because "linux_386_linux_386" failed.
docker (linux/amd64, linux, amd64)
The operation was canceled.