/ BICEP Public

Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model

License

Notifications You must be signed in to change notification settings

pnnl/BICEP

Repository files navigation

Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model

This repo contains the code for the BICEP model. It was developed with funding from DOE's EERE Strategic Analysis.

BICEP is a probabilistic model that provides a granular estimation of existing electrical capacity and the required additional capacity for the various electrification technologies in the future energy scenarios based on the net change in load on a per-customer basis.

The model leverages data products from other sectoral models, primarily those estimating high resolution spatial and temporal demand load profiles: ResStock, ComStock, Scout, dGEN, ReEDS, and TEMPO. ResStock/ComStock outputs are used to estimate existing building electrical capacity and the load associated with the building electrification technologies. Adoption forecasts for the various technologies are sourced from the other models.

Basic overview of BICEP model framework.

Notice

This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor Battelle, nor any of their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

   PACIFIC NORTHWEST NATIONAL LABORATORY
   operated by
   BATTELLE
   for the
   UNITED STATES DEPARTMENT OF ENERGY
   under Contract DE-AC05-76RL01830
   

License

Released under the 2-Clause BSD license (see LICENSE.txt)

About

Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model