Skip to content

Sync wip

Sync wip #4236

Triggered via push August 29, 2024 12:10
Status Failure
Total duration 6m 10s
Artifacts

pest.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
P8.2 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10____2" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10____2" failed.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_10____2" failed.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.