Skip to content

Update Rust crate pyo3 to 0.22.0 #392

Update Rust crate pyo3 to 0.22.0

Update Rust crate pyo3 to 0.22.0 #392

Triggered via push October 29, 2024 14:24
Status Failure
Total duration 43s
Artifacts

ci.yml

on: push
test-rust
23s
test-rust
Matrix: test-python
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test-rust
Process completed with exit code 101.
test-python (3.9)
Process completed with exit code 1.
test-python (3.8)
The job was canceled because "_3_9" failed.
test-python (3.8)
Process completed with exit code 1.
test-python (3.11)
The job was canceled because "_3_9" failed.
test-python (3.11)
Process completed with exit code 1.
test-python (3.10)
The job was canceled because "_3_9" failed.
test-python (3.10)
The operation was canceled.
test-python (3.7)
The job was canceled because "_3_9" failed.
test-python (3.7)
The operation was canceled.