Skip to content

internal go contact map #637

internal go contact map

internal go contact map #637

Triggered via pull request January 3, 2025 18:47
Status Failure
Total duration 5m 22s
Artifacts

run_tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
build (3.11)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.12)
The operation was canceled.
docs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636