Skip to content

chore(deps): update dependency rollup to v4.32.0 #699

chore(deps): update dependency rollup to v4.32.0

chore(deps): update dependency rollup to v4.32.0 #699

Triggered via pull request January 8, 2025 15:35
Status Failure
Total duration 2m 18s
Artifacts

test.yml

on: pull_request
Matrix: integration
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
unit-test (21)
Process completed with exit code 1.
unit-test (22)
The job was canceled because "_21" failed.
unit-test (22)
The operation was canceled.
unit-test (20)
The job was canceled because "_21" failed.
unit-test (20)
The operation was canceled.
integration (2)
Process completed with exit code 1.
integration (1)
The job was canceled because "_2" failed.
integration (1)
Process completed with exit code 1.
integration (0)
The job was canceled because "_2" failed.
integration (0)
The operation was canceled.
integration (4)
The job was canceled because "_2" failed.
integration (4)
The operation was canceled.
integration (3)
The job was canceled because "_2" failed.
integration (3)
The operation was canceled.
unit-test (21)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
integration (2)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636