refactor: refactor the e2e file server (#3741) #126
Annotations
7 errors and 5 warnings
compatibility_e2e_tests (seed-client)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c yarn install --frozen-lockfile --network-timeout 1000000" did not complete successfully: exit code: 1
|
compatibility_e2e_tests (manager)
The job was canceled because "seed-client" failed.
|
compatibility_e2e_tests (manager)
The operation was canceled.
|
compatibility_e2e_tests (scheduler)
The job was canceled because "seed-client" failed.
|
compatibility_e2e_tests (scheduler)
The operation was canceled.
|
compatibility_e2e_tests (client)
The job was canceled because "seed-client" failed.
|
compatibility_e2e_tests (client)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
compatibility_e2e_tests (seed-client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
compatibility_e2e_tests (manager)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
compatibility_e2e_tests (scheduler)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
compatibility_e2e_tests (client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
fcgxz2003~Dragonfly2~8KE65C.dockerbuild
|
42.3 KB |
|
fcgxz2003~Dragonfly2~8T1R3R.dockerbuild
|
42.1 KB |
|
fcgxz2003~Dragonfly2~HHV7EN.dockerbuild
|
42.1 KB |
|
fcgxz2003~Dragonfly2~J0E19Q.dockerbuild
|
24 KB |
|