Skip to content

Merge pull request #629 from ethereum/symb-to-concrete #3049

Merge pull request #629 from ethereum/symb-to-concrete

Merge pull request #629 from ethereum/symb-to-concrete #3049

Triggered via push January 9, 2025 15:21
Status Cancelled
Total duration 48s
Artifacts 1

build.yml

on: push
bitwuzla-build (win64 target)  /  build
7s
bitwuzla-build (win64 target) / build
cabal-check
36s
cabal-check
Matrix: extra-tests
Matrix: nix-build
build (windows-latest)
0s
build (windows-latest)
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 1 warning
build (windows-latest)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
build (windows-latest)
A task was canceled.
extra-tests (macos-latest)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
extra-tests (macos-latest)
The operation was canceled.
nix-build (osx-x64)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
nix-build (osx-x64)
The operation was canceled.
nix-build (osx-arm64)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
nix-build (osx-arm64)
The operation was canceled.
cabal-check
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
cabal-check
The operation was canceled.
nix-build (linux-x64)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
nix-build (linux-x64)
The operation was canceled.
extra-tests (ubuntu-latest)
Canceling since a higher priority waiting request for 'Build-refs/heads/main' exists
extra-tests (ubuntu-latest)
The operation was canceled.
bitwuzla-build (win64 target) / build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
bitwuzla-win64
4.66 MB