Skip to content

Dependency fixes.

Dependency fixes. #194

Triggered via push January 28, 2025 14:07
Status Failure
Total duration 11m 21s
Artifacts

multiarch.yml

on: push
Matrix: build_job
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Fedora 41: GCC/PPC64
The process '/home/runner/work/_actions/dreibh/run-on-arch-action/dreibh/tests/src/run-on-arch.sh' failed with exit code 2
Ubuntu 22.04 (Noble Numbat): Clang/ARMv8
The job was canceled because "Fedora_41__GCC_PPC64_ppc6" failed.
Ubuntu 22.04 (Noble Numbat): Clang/ARMv8
The operation was canceled.
Ubuntu 22.04 (Noble Numbat): GCC/S390x
The job was canceled because "Fedora_41__GCC_PPC64_ppc6" failed.
Ubuntu 22.04 (Noble Numbat): GCC/S390x
The operation was canceled.
Debian 12 (Bookworm): Clang/ARMv7
The job was canceled because "Fedora_41__GCC_PPC64_ppc6" failed.
Debian 12 (Bookworm): Clang/ARMv7
The operation was canceled.
Ubuntu 22.04 (Noble Numbat): GCC/RISC-V
The job was canceled because "Fedora_41__GCC_PPC64_ppc6" failed.
Ubuntu 22.04 (Noble Numbat): GCC/RISC-V
The operation was canceled.