build(deps): bump mkdocs-material from 9.4.4 to 9.4.7 in /docs #228
ci.yml
on: push
Build and Lint
1m 35s
Build Documentation
36s
Run tests on previous stable Go
0s
Matrix: Run tests on pre-built kernel
Annotations
2 errors
Build and Lint
Canceling since a higher priority waiting request for '.github/workflows/ci.yml-refs/heads/main' exists
|
Build and Lint
The operation was canceled.
|