Migration jest => vitest + upgrade vue 3 #9852
Triggered via pull request
January 31, 2025 09:36
Status
Cancelled
Total duration
2m 29s
Artifacts
–
ci.yml
on: pull_request
Install
17s
Install OpenFisca
21s
Build contribuer/ static site
20s
Check openfisca requirement changes
5s
health-check
4s
Matrix: End-to-End Tests
Openfisca definition periods tests
0s
Check benefit link improvements and update link table if necessary
0s
Detect failure
0s
Annotations
11 errors
Check data file consistency
Process completed with exit code 127.
|
End-to-End Tests (handicap)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
|
End-to-End Tests (handicap)
The operation was canceled.
|
End-to-End Tests (student)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
|
End-to-End Tests (student)
The operation was canceled.
|
End-to-End Tests (patrimoine)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
|
End-to-End Tests (patrimoine)
The operation was canceled.
|
End-to-End Tests (family)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
|
End-to-End Tests (family)
The operation was canceled.
|
End-to-End Tests (base)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
|
End-to-End Tests (base)
The operation was canceled.
|