Skip to content

Migration jest => vitest + upgrade vue 3 #9852

Migration jest => vitest + upgrade vue 3

Migration jest => vitest + upgrade vue 3 #9852

Triggered via pull request January 31, 2025 09:36
Status Cancelled
Total duration 2m 29s
Artifacts

ci.yml

on: pull_request
Install OpenFisca
21s
Install OpenFisca
Build contribuer/ static site
20s
Build contribuer/ static site
Check openfisca requirement changes
5s
Check openfisca requirement changes
health-check
4s
health-check
Check data file consistency
8s
Check data file consistency
Lint
45s
Lint
Iframe build control
16s
Iframe build control
Matrix: End-to-End Tests
Openfisca definition periods tests
0s
Openfisca definition periods tests
Unit tests
0s
Unit tests
OpenFisca test generation
0s
OpenFisca test generation
Check benefit link improvements and update link table if necessary
0s
Check benefit link improvements and update link table if necessary
Detect failure
0s
Detect failure
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Check data file consistency
Process completed with exit code 127.
End-to-End Tests (handicap)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
End-to-End Tests (handicap)
The operation was canceled.
End-to-End Tests (student)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
End-to-End Tests (student)
The operation was canceled.
End-to-End Tests (patrimoine)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
End-to-End Tests (patrimoine)
The operation was canceled.
End-to-End Tests (family)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
End-to-End Tests (family)
The operation was canceled.
End-to-End Tests (base)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/4806/merge' exists
End-to-End Tests (base)
The operation was canceled.