Skip to content

Lint

Lint #2914

Triggered via push November 20, 2023 17:28
Status Cancelled
Total duration 2m 35s
Artifacts 1

ci.yml

on: push
All required checks done
0s
All required checks done
Fit to window
Zoom out
Zoom in

Annotations

21 errors
test / Golang Mod Up To Date
Process completed with exit code 2.
lint / Lint Go
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
lint / Lint Go: internal/scheduler/simulator/simulator.go#L685
Error return value of `txn.Upsert` is not checked (errcheck)
lint / Lint Go: internal/scheduler/simulator/simulator.go#L820
Error return value of `txn.Upsert` is not checked (errcheck)
lint / Lint Go
issues found
test / TypeScript Unit Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
test / TypeScript Unit Tests
❌ No test results found for JUnit Test Report
test / TypeScript Unit Tests
No files were found with the provided path: ./internal/lookout/ui/junit.xml. No artifacts will be uploaded.
test / TypeScript Unit Tests
The operation was canceled.
test / Proto Up To Date
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
test / Proto Up To Date
The operation was canceled.
test / Golang Unit Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
test / Golang Unit Tests
The operation was canceled.
test / Golang Unit Tests
❌ No test results found for JUnit Test Report
test / Golang Unit Tests
No files were found with the provided path: test-reports/. No artifacts will be uploaded.
build / prepare
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
build / prepare
The operation was canceled.
test / Golang Integration Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/severinson/write-simulated-events' exists
test / Golang Integration Tests
❌ No test results found for JUnit Test Report
test / Golang Integration Tests
The operation was canceled.
test / Golang Integration Tests
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
docker-compose-logs Expired
54 Bytes