docs: Adding --upgrade to the install command (#115) #37
Annotations
9 errors and 2 warnings
Release Go Binary (windows, amd64)
Process completed with exit code 2.
|
Release Go Binary (linux, arm64)
The job was canceled because "windows_amd64" failed.
|
Release Go Binary (linux, arm64)
Process completed with exit code 2.
|
Release Go Binary (linux, amd64)
The job was canceled because "windows_amd64" failed.
|
Release Go Binary (linux, amd64)
The operation was canceled.
|
Release Go Binary (darwin, amd64)
The job was canceled because "windows_amd64" failed.
|
Release Go Binary (darwin, amd64)
The operation was canceled.
|
Release Go Binary (darwin, arm64)
The job was canceled because "windows_amd64" failed.
|
Release Go Binary (darwin, arm64)
The operation was canceled.
|
Release Go Binary (windows, amd64)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Release Go Binary (darwin, arm64)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1
|