Skip to content

ci-all-via-ir

ci-all-via-ir #50

Manually triggered February 22, 2024 22:56
Status Cancelled
Total duration 16m 41s
Artifacts

ci-all-via-ir.yml

on: workflow_dispatch
Matrix: Forge Testing all via-ir
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Forge Testing all via-ir (via-ir-2)
The run was canceled by @Vectorized.
Forge Testing all via-ir (via-ir-2)
The operation was canceled.
Forge Testing all via-ir (via-ir-1)
The run was canceled by @Vectorized.
Forge Testing all via-ir (via-ir-1)
The operation was canceled.
Forge Testing all via-ir (via-ir-3)
The run was canceled by @Vectorized.
Forge Testing all via-ir (via-ir-3)
The operation was canceled.
Forge Testing all via-ir (via-ir-0)
The run was canceled by @Vectorized.
Forge Testing all via-ir (via-ir-0)
The operation was canceled.