Skip to content

5.x devise-two-factor upgrade phase 1 #498

5.x devise-two-factor upgrade phase 1

5.x devise-two-factor upgrade phase 1 #498

Triggered via push January 17, 2025 16:19
Status Cancelled
Total duration 2m 1s
Artifacts 3

ci_checks.yml

on: push
Linting and formatting
1m 50s
Linting and formatting
Static analysis
1m 39s
Static analysis
Specs and coverage
1m 52s
Specs and coverage
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Static analysis
The run was canceled by @rgarner.
Static analysis
The operation was canceled.
Linting and formatting
The run was canceled by @rgarner.
Linting and formatting
The operation was canceled.
Specs and coverage
The run was canceled by @rgarner.
Specs and coverage
The operation was canceled.

Artifacts

Produced during runtime
Name Size
UKGovernmentBEIS~beis-report-official-development-assistance~B8IX17.dockerbuild
64.8 KB
UKGovernmentBEIS~beis-report-official-development-assistance~BBPJCV.dockerbuild
65.3 KB
UKGovernmentBEIS~beis-report-official-development-assistance~N7SRA6.dockerbuild
64.7 KB