Skip to content

Commit

Permalink
Merge pull request #31 from Open-ISP/read-table-edge-case-fixes
Browse files Browse the repository at this point in the history
Fix `read_table` column edge case issues
  • Loading branch information
prakaa authored Sep 5, 2024
2 parents 2e72d64 + b534c9b commit 8f1a006
Show file tree
Hide file tree
Showing 52 changed files with 111 additions and 152 deletions.
6 changes: 1 addition & 5 deletions example_output/6.0/additional_projects_summary.csv
Original file line number Diff line number Diff line change
@@ -1,8 +1,4 @@
Additional projects,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),"Forced outage rate_Full outage
(% of time)_Until 2022","Forced outage rate_Full outage
(% of time)_Post 2022","Forced outage rate_Partial outage
(% of time)_Until 2022","Forced outage rate_Partial outage
(% of time)_Post 2022",Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Additional projects,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Coppabella Wind Farm,Wind,NSW,SNSW,Tumut,Additional projects,Additional projects,Wind,Wind,Mortlake South Wind Farm,Mortlake South Wind Farm,Wind,Wind,Wind,Wind,Wind,Wind,Wind,Wind,Wind,Wind,Wind,All Wind,All Wind,All Wind,Coppabella Wind Farm,Wind
Derby Solar Project BESS,Battery Storage,VIC,VIC,Murray River,Additional projects,Additional projects,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,All Battery storage (2hrs storage),All Battery storage (2hrs storage),All Battery storage (2hrs storage),Derby Solar Project BESS,Battery Storage
Fulham Solar Farm,Large scale Solar PV,VIC,VIC,Gippsland,Additional projects,Additional projects,Solar,Solar,Frasers Solar Farm,Frasers Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,All Large scale solar PV,All Large scale solar PV,All Large scale solar PV,Fulham Solar Farm,Solar
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/affine_heat_rates_new_entrants.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Technology,Unit nominal capacity (MW),No load heat input (GJ/h).1,Marginal heat rate (GJ/MWh).1
Technology,Unit nominal capacity (MW),No load heat input (GJ/h),Marginal heat rate (GJ/MWh)
OCGT (small GT),49.0,133.26693333333316,7.470500644286201
OCGT (large GT),265.0,720.7293333333324,8.211510347152009
CCGT,409.0,390.12757142857146,6.2953736263736255
Expand Down
6 changes: 1 addition & 5 deletions example_output/6.0/anticipated_projects_summary.csv
Original file line number Diff line number Diff line change
@@ -1,8 +1,4 @@
Anticipated projects,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),"Forced outage rate_Full outage
(% of time)_Until 2022","Forced outage rate_Full outage
(% of time)_Post 2022","Forced outage rate_Partial outage
(% of time)_Until 2022","Forced outage rate_Partial outage
(% of time)_Post 2022",Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Anticipated projects,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
SA Hydrogen Turbine,Hydrogen-based gas turbines,SA,CSA,CSA,Anticipated,SA Low,Hyblend,SA new OCGT,SA Hydrogen Turbine,SA Hydrogen Turbine,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,Hydrogen-based gas turbines,SA Hydrogen Turbine,SA Hydrogen Turbine,SA Hydrogen Turbine,SA Hydrogen Turbine,Hydrogen-based gas turbines
Borumba,Pumped Hydro,QLD,SQ,Banana,Anticipated,Anticipated,Water,Hydro,Borumba,Borumba,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,All Hydro,All Hydro,All Hydro,Borumba,Hydro
Aramara Solar Farm,Large scale Solar PV,QLD,SQ,Wide Bay,Anticipated,Anticipated,Solar,Solar,Aramara Solar Farm,Aramara Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,All Large scale solar PV,All Large scale solar PV,All Large scale solar PV,Aramara Solar Farm,Solar
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/auxiliary_load_new_entrants.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Generator,Auxiliary load (% of nameplate capacity).1
Generator,Auxiliary load (% of nameplate capacity)
OCGT (small GT),1.7000000000000002
OCGT (large GT),1.0999999999999999
CCGT,2.5
Expand Down
6 changes: 1 addition & 5 deletions example_output/6.0/batteries_summary.csv
Original file line number Diff line number Diff line change
@@ -1,8 +1,4 @@
Batteries,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),"Forced outage rate_Full outage
(% of time)_Until 2022","Forced outage rate_Full outage
(% of time)_Post 2022","Forced outage rate_Partial outage
(% of time)_Until 2022","Forced outage rate_Partial outage
(% of time)_Post 2022",Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Batteries,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Adelaide Desalination Plant BESS,Battery Storage,SA,CSA,CSA,Existing,Existing,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,All Battery storage (2hrs storage),All Battery storage (2hrs storage),All Battery storage (2hrs storage),Adelaide Desalination Plant BESS,Battery Storage
Aldoga BESS Stage 1,Battery Storage,QLD,GG,GG,Anticipated,Anticipated,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,All Battery storage (1hr storage),All Battery storage (1hr storage),All Battery storage (1hr storage),Aldoga BESS Stage 1,Battery Storage
Ballarat Energy Storage System,Battery Storage,VIC,VIC,Western Victoria,Existing,Existing,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,All Battery storage (1hr storage),All Battery storage (1hr storage),All Battery storage (1hr storage),Ballarat Energy Storage System,Battery Storage
Expand Down
15 changes: 4 additions & 11 deletions example_output/6.0/biomass_prices.csv
Original file line number Diff line number Diff line change
@@ -1,11 +1,4 @@
Property,Battery storage (1hr storage),Battery storage (2hrs storage),Battery storage (4hrs storage),Battery storage (8hrs storage),"Virtual Power Plants
(aggregated ESS)4",Units
Maximum power1,1,1,1,1,1,MW
Energy capacity2,1,2,4,8,2.2,MWh
Round trip efficiency (aggregated)3,not applicable,not applicable,not applicable,not applicable,85,%
Charge efficiency (utility),91.6515138991168,91.6515138991168,92.19544457292888,91.10433579144299,not applicable,%
Discharge efficiency (utility),91.6515138991168,91.6515138991168,92.19544457292888,91.10433579144299,not applicable,%
Round trip efficiency (utility),84,84,85,83,not applicable,%
Annual degradation (utility),1.8,1.8,1.8,1.8,,%
Allowable max state of charge,100,100,100,100,85,%
Allowable min state of charge,0,0,0,0,0,%
Biomass price,Price Scenario,2022-23,2023-24,2024-25,2025-26,2026-27,2027-28,2028-29,2029-30,2030-31,2031-32,2032-33,2033-34,2034-35,2035-36,2036-37,2037-38,2038-39,2039-40,2040-41,2041-42,2042-43,2043-44,2044-45,2045-46,2046-47,2047-48,2048-49,2049-50,2050-51,2051-52,2052-53,2053-54
Biomass,Central,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265
Biomass,Low Price,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265
Biomass,High Price,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265,0.624253379366265
2 changes: 1 addition & 1 deletion example_output/6.0/build_limits_phes.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Name_Name,ISP Sub-region,Region,Pumped Hydro Energy Storage (PHES) limits (MW)_8hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_24hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_48hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_BOTN - Cethana
Name,ISP Sub-region,Region,Pumped Hydro Energy Storage (PHES) limits (MW)_8hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_24hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_48hrs storage,Pumped Hydro Energy Storage (PHES) limits (MW)_BOTN - Cethana
Northern New South Wales,NNSW,NSW,1275,500,500,0
Central New South Wales,CNSW,NSW,1750,235,83,0
South New South Wales,SNSW,NSW,2500,583,167,0
Expand Down
Original file line number Diff line number Diff line change
@@ -1,2 +1,2 @@
Unnamed: 7,Progressive Change ,Step Change ,Green Energy Exports
Unnamed: 7,Progressive Change,Step Change,Green Energy Exports
Fuel Cost Scenario,High price,Central,Low price
6 changes: 1 addition & 5 deletions example_output/6.0/committed_generator_summary.csv
Original file line number Diff line number Diff line change
@@ -1,8 +1,4 @@
Committed generator,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),"Forced outage rate_Full outage
(% of time)_Until 2022","Forced outage rate_Full outage
(% of time)_Post 2022","Forced outage rate_Partial outage
(% of time)_Until 2022","Forced outage rate_Partial outage
(% of time)_Post 2022",Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Committed generator,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Kurri Kurri OCGT,OCGT,NSW,SNW,SNW,Committed,Committed,Gas,Kurri Kurri,Kurri Kurri OCGT,Kurri Kurri OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,Kurri Kurri OCGT,Kurri Kurri OCGT,Kurri Kurri OCGT2,Kurri Kurri OCGT,OCGT
Tallawarra B*,OCGT,NSW,SNW,SNW,Committed,Committed,Gas,Tallawarra B,Tallawarra B*,Tallawarra B*,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,Tallawarra B,Tallawarra B,Tallawarra B,Tallawarra B*,OCGT
Kidston ,Pumped Hydro,QLD,NQ,NQ,Committed,Committed,Water,Hydro,Kidston ,Kidston ,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,All Hydro,All Hydro,All Hydro,Kidston ,Hydro
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/connection_costs_for_wind_and_solar.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
REZ names,Region,REZ network voltage (kV),Connection capacity (MVA),Feeder length (km),Total cost ($M)2,$/kW,System Strength connection cost ($/kW)3
REZ names,Region,REZ network voltage (kV),Connection capacity (MVA),Feeder length (km),Total cost ($M),$/kW,System Strength connection cost ($/kW)
Far North Queensland,QLD,275,300.0,5.0,35.0,116.67,137.0
North Queensland Clean Energy Hub,QLD,275,300.0,10.0,48.0,160.0,137.0
Northern Queensland,QLD,275,300.0,5.0,35.0,116.67,137.0
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/connection_costs_other.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Region,CCGT2,CCGT with CCS,Small OCGT2,Large OCGT,Reciprocating engines,Hydrogen Reciprocating engines,Biomass,1 hr Battery Storage,2 hr Battery Storage,4 hr Battery Storage,8 hr Battery Storage,Pumped Hydro3 (8 hrs storage),Pumped Hydro (24 hrs storage),Pumped Hydro (48 hrs storage),BOTN- Cethana
Region,CCGT,CCGT with CCS,Small OCGT,Large OCGT,Reciprocating engines,Hydrogen Reciprocating engines,Biomass,1 hr Battery Storage,2 hr Battery Storage,4 hr Battery Storage,8 hr Battery Storage,Pumped Hydro3 (8 hrs storage),Pumped Hydro (24 hrs storage),Pumped Hydro (48 hrs storage),BOTN- Cethana
QLD,110.49433333333297,110.49433333333297,110.49433333333332,110.49433333333332,110.49433333333332,110.49433333333332,110.49433333333332,103.36566666666667,103.36566666666667,103.36566666666667,103.36566666666667,0,0,0,0
NSW,85.544,85.544,85.544,85.544,85.544,85.544,85.544,77.52425,77.52425,77.52425,77.52425,0,0,0,0
VIC,80.19749999999999,80.19749999999999,115.4844,115.4844,115.4844,115.4844,115.4844,106.92999999999999,106.92999999999999,106.92999999999999,106.92999999999999,0,0,0,0
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/connection_costs_outside_rez.csv
Original file line number Diff line number Diff line change
@@ -1,3 +1,3 @@
Non-REZ name,Region,Network voltage (kV),Connection capacity (MVA),Feeder length (km),Total cost ($M),$/kW,System strength connection costs ($/kW)2
Non-REZ name,Region,Network voltage (kV),Connection capacity (MVA),Feeder length (km),Total cost ($M),$/kW,System strength connection costs ($/kW)
New South Wales Non-REZ,NSW,500,600,20,138,230,137
Victoria Non-REZ,VIC,500,600,20,126,210,137
2 changes: 1 addition & 1 deletion example_output/6.0/emissions_intensity_new_entrants.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Generator.1,Scope 1 emissions intensity (kg/MWh as-gen).1
Generator,Scope 1 emissions intensity (kg/MWh as-gen)
OCGT (small GT),541.6007456765004
OCGT (large GT),580.9846703741154
CCGT,377.6704246153846
Expand Down
Original file line number Diff line number Diff line change
@@ -1,5 +1,4 @@
Fuel Type,"Full outage
(% of time)",Mean time to repair (hrs)
Fuel Type,Full outage (% of time),Mean time to repair (hrs)
All Coal Average,0.009001590861024021,5621.528766731918
OCGT,0.00774428665878886,2561.7305333333334
Hydro,0.0009648237633182907,2870.056
Expand Down
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Fuel type,Forced Outage Rate (%)_Full outage (% of time),Forced Outage Rate (%)_Partial outage (% of time),Mean time to repair (hrs) _Full outage,Mean time to repair (hrs) _Partial outage,Partial Outage Derating Factor (%)
Fuel type,Forced Outage Rate (%)_Full outage (% of time),Forced Outage Rate (%)_Partial outage (% of time),Mean time to repair (hrs)_Full outage,Mean time to repair (hrs)_Partial outage,Partial Outage Derating Factor (%)
Brown Coal,0.0775,0.1156,90.05,12.2,0.1791
Black Coal NSW,0.0631,0.3146,157.62,33.97,0.166
Black Coal QLD,0.0675,0.1286,185.0,56.42,0.2516
Expand Down
6 changes: 1 addition & 5 deletions example_output/6.0/existing_generator_summary.csv
Original file line number Diff line number Diff line change
@@ -1,8 +1,4 @@
Existing generator,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),"Forced outage rate_Full outage
(% of time)_Until 2022","Forced outage rate_Full outage
(% of time)_Post 2022","Forced outage rate_Partial outage
(% of time)_Until 2022","Forced outage rate_Partial outage
(% of time)_Post 2022",Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Existing generator,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Bayswater,Steam Sub Critical,NSW,CNSW,CNSW,Existing,Existing,Black Coal,Bayswater,Bayswater,Bayswater,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal,BW01,NSW Coal,Bayswater,Bayswater,Bayswater,Bayswater,Black Coal NSW
Eraring,Steam Sub Critical,NSW,SNW,SNW,Existing,Existing,Black Coal,Eraring,Eraring,Eraring,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal,ER01,NSW Coal,Eraring,Eraring,Eraring,Eraring,Black Coal NSW
Mt Piper,Steam Sub Critical,NSW,CNSW,CNSW,Existing,Existing,Black Coal,Mt Piper,Mt Piper,Mt Piper,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal NSW,Black Coal,MP1,NSW Coal,Mt Piper,Mt Piper,Mt Piper,Mt Piper,Black Coal NSW
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/expected_closure_years.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
Generator name,DUID,Expected Closure Year (Calendar year),QEJP Expected Closure Year (Calendar year) - Phase 1 / Phase2 / Phase3
Generator name,DUID,Expected Closure Year (Calendar year),QEJP Expected Closure Year (Calendar year) - Phase 1 / Phase2 / Phase
Bayswater,BW01,2033,
Bayswater,BW02,2033,
Bayswater,BW03,2033,
Expand Down
Loading

0 comments on commit 8f1a006

Please sign in to comment.