ci: Version update for Fedora reproducible build #12091
ci.yaml
on: push
Pre-build checks
16m 42s
Check Nix Flake
16m 17s
Matrix: compile
Run fuzz regression tests
8m 57s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
11 errors
Valgrind Test CLN Valgrind (02/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__02_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (03/10)
The job was canceled because "Valgrind__02_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (03/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__02_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
|
Test CLN clang
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 120 minutes.
|
Test CLN clang
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job running on runner GitHub Actions 30 has exceeded the maximum execution time of 120 minutes.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
|
194 MB |
|
cln-compile-clang.tar.bz2
|
131 MB |
|
cln-compile-gcc-O3.tar.bz2
|
163 MB |
|
cln-compile-gcc.tar.bz2
|
130 MB |
|