Skip to content

build: Fix libpq for Docker multi-arch builds and Bookworm upgrade #11983

build: Fix libpq for Docker multi-arch builds and Bookworm upgrade

build: Fix libpq for Docker multi-arch builds and Bookworm upgrade #11983

Triggered via pull request January 14, 2025 16:11
Status Failure
Total duration 1h 16m 2s
Artifacts 4

ci.yaml

on: pull_request
Matrix: compile
Run fuzz regression tests
9m 50s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Valgrind Test CLN Valgrind (04/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
Valgrind Test CLN Valgrind (03/10)
The job was canceled because "Valgrind__04_10__--test-g" failed.
Valgrind Test CLN Valgrind (03/10)
The operation was canceled.
Test CLN gcc
Process completed with exit code 1.
Test CLN postgres
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN postgres
The operation was canceled.
Test CLN clang
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN clang
The operation was canceled.
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2 Expired
194 MB
cln-compile-clang.tar.bz2 Expired
131 MB
cln-compile-gcc-O3.tar.bz2 Expired
163 MB
cln-compile-gcc.tar.bz2 Expired
130 MB