Skip to content

Commit

Permalink
Update operations/iuf/workflows/management_rollout.md
Browse files Browse the repository at this point in the history
Signed-off-by: Nathan Rockershousen <[email protected]>
  • Loading branch information
nrockershousen authored Jan 24, 2025
1 parent 5bd925a commit 5c09916
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion operations/iuf/workflows/management_rollout.md
Original file line number Diff line number Diff line change
Expand Up @@ -58,7 +58,7 @@ nodes. This initial test node is referred to as the "canary node". Modify the pr
**`NOTE`** Additional arguments are available to control the behavior of the `management-nodes-rollout` stage, for example `--limit-management-rollout` and `-cmrp`. See the
[`management-nodes-rollout` stage documentation](../stages/management_nodes_rollout.md) for details and adjust the examples below if necessary.

**`NOTE`** When using the option `--limit-management-rollout` to pass the list of nodes for `management-nodes-rollout` ensure that the label `iuf-prevent-rollout=true` is not set on any of the nodes passed in the list.
**`NOTE`** When using the option `--limit-management-rollout` to pass the list of nodes for `management-nodes-rollout`, ensure that the label `iuf-prevent-rollout=true` is not set on any of the nodes passed in the list.

1. (`ncn-m001#`) Verify if any nodes are labeled with `iuf-prevent-rollout=true`.

Expand Down

0 comments on commit 5c09916

Please sign in to comment.