Link level tomography should not be in finish()
and it should update cost in Routing Daemon
#511
Labels
connection
network-layer issues
link
link layer
physical
error models, simulation of new hardware elements
tomography
full tomo, CHSH, etc.
The problem:
Link-level tomography is done to assign a cost to the routing daemon. This should be a process that is done before applications are run in QuISP. So the tomography calculation should not be inside the
finish()
function of the Hardware Monitor.Suggested Solution:
Create a new module which handles tomography because it is a common subroutine that should be done at both connection-level and link-level. Bonus points if the tomography module can perform state tomography on multipartite states (need to generalize the way Stoke's parameters are defined in current implementation).
The text was updated successfully, but these errors were encountered: