========================= main branch (edge channel) =======================>
\ \ \
\___v0.7.0 tag \ \
\ \ v0.9.0 tag__\
\ v0.8.0 tag__\ \
v0.7.1 tag__\ \ v0.9 branch (beta channel)
\___v0.7.2 tag \___v0.8.1 tag
\ \
\ \
v0.7 branch v0.8 branch (stable channel)
All new development occurs on the main
branch.
Bug fixes that affect a vX.Y
branch are first made on main
. This is to
allow a fix some soak time on main
before it is applied to one or more
stabilization branches.
Merging to main
first also helps ensure that fixes applied to one release
are present for future releases. (Sometimes the joy of landing a critical
release blocker in a branch causes you to forget to propagate back to
main
!)"
Once the bug fix lands on main
it is cherry-picked into the vX.Y
branch
and potentially the vX.Y-1
branch. The exception to this rule is when a bug
fix for vX.Y
doesn't apply to main
or vX.Y-1
.
Immediately after a new stabilization branch is forged, the Cargo.toml
minor
version (Y) in the main
branch is incremented by the release engineer.
Incrementing the major version of the main
branch is outside the scope of
this document.
These are stabilization branches for a given milestone. They are created off
the main
branch as late as possible prior to the milestone release.
The release tags are created as desired by the owner of the given stabilization branch, and cause that X.Y.Z release to be shipped to https://crates.io
Immediately after a new vX.Y.Z branch tag has been created, the Cargo.toml
patch version number (Z) of the stabilization branch is incremented by the
release engineer.
Channels are used by end-users (humans and bots) to consume the branches described in the previous section, so they may automatically update to the most recent version matching their desired stability.
There are three release channels that map to branches as follows:
- edge - tracks the
main
branch, least stable. - beta - tracks the largest (and latest)
vX.Y
stabilization branch, more stable. - stable - tracks the second largest
vX.Y
stabilization branch, most stable.
- Check out the latest commit on
main
branch:git fetch --all git checkout upstream/main
- Determine the new branch name. The name should be "v" + the first 2 version fields from Cargo.toml. For example, a Cargo.toml with version = "0.9.0" implies the next branch name is "v0.9".
- Create the new branch and push this branch to the
kug
repository:git checkout -b <branchname> git push -u origin <branchname>
Alternatively use the Github UI.
- After the new branch has been created and pushed, update the Cargo.toml files on main to the next semantic version (e.g. 0.9.0 -> 0.10.0) with:
$ scripts/increment-cargo-version.sh minor
- Push all the changed Cargo.toml and Cargo.lock files to the
main
branch with something like:git co -b version_update git ls-files -m | xargs git add git commit -m 'Bump version to X.Y+1.0' git push -u origin version_update
- Confirm that your freshly cut release branch is shown as
BETA_CHANNEL
and the previous release branch asSTABLE_CHANNEL
:ci/channel-info.sh
- TODO: docs update
- Go to GitHub Releases for tagging a release.
- Click "Draft new release". The release tag must exactly match the
version
field in/Cargo.toml
prefixed byv
.- If the Cargo.toml version field is 0.12.3, then the release tag must be v0.12.3
- Make sure the Target Branch field matches the branch you want to make a release on.
- If you want to release v0.12.0, the target branch must be v0.12
- Fill the release notes.
- If this is the first release on the branch (e.g. v0.13.0), paste in this template. Engineering Lead can provide summary contents for release notes if needed.
- If this is a patch release, review all the commits since the previous release on this branch and add details as needed.
- Click "Save Draft", then confirm the release notes look good and the tag name and branch are correct.
- Ensure all desired commits (usually backports) are landed on the branch by now.
- Ensure the release is marked "This is a pre-release". This flag will need to be removed manually after confirming the Linux binary artifacts appear at a later step.
- Go back into edit the release and click "Publish release" while being marked as a pre-release.
- Confirm there is new git tag with intended version number at the intended revision after running
git fetch
locally.
This action ensures that publishing a release will trigger the creation of a PR to update the Cargo.toml files on release branch to the next semantic version (e.g. 0.9.0 -> 0.9.1). Ensure that the created PR makes it through CI and gets submitted.
- Go to GitHub Releases and create a new draft release for
X.Y.Z+1
with empty release notes. This allows people to incrementally add new release notes until it's time for the next release- Also, point the branch field to the same branch and mark the release as "This is a pre-release".
- Go to the Github Milestones. Create a new milestone for the
X.Y.Z+1
, move over unresolved issues still in theX.Y.Z
milestone, then close theX.Y.Z
milestone.
Go to Releases and click on the latest release that you just published. Verify that all of the build artifacts are present, then uncheck "This is a pre-release" for the release.
Build artifacts can take up to 60 minutes after creating the tag before appearing. To check for progress:
- The Windows release artifacts are produced by GitHub Actions. Look for a job under the tag name of the release: https://github.com/kuglabs/kug/actions.
- Linux and macOS release artifacts TODO: setup buildkite pipeline