You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
As for now, when I run some jobs manually (ie. to transcode finished live-streams), the jobs don't have a priority number. So when a user uploads a new video, the uploaded video transcoding won't start until all the manually added jobs are finished.
Describe the solution you would like
I don't know if this is the desired behavior but I think it would be better to assign a very low priority to manual jobs so the public queue doesn't get stuck for a long time.
Thanks.
The text was updated successfully, but these errors were encountered:
Describe the problem to be solved
As for now, when I run some jobs manually (ie. to transcode finished live-streams), the jobs don't have a priority number. So when a user uploads a new video, the uploaded video transcoding won't start until all the manually added jobs are finished.
Describe the solution you would like
I don't know if this is the desired behavior but I think it would be better to assign a very low priority to manual jobs so the public queue doesn't get stuck for a long time.
Thanks.
The text was updated successfully, but these errors were encountered: